Saxon Gym

Complete electrical installation for an industrial unit conversion, designed and delivered within a six-week programme.

Design, specification and complete electrical installation converting an existing industrial unit into a purpose-built training facility for Saxon Gym in Cannock.

Client
Saxon Gym
Sector
Leisure & Fitness
Location
Cannock, Staffordshire
Scope
Design, Specification & Complete Electrical Installation
Programme
6 weeks
Project type
Industrial unit conversion
Appointment
Direct appointment by the client
Ongoing support
Electrical maintenance
Main gym floor at Saxon Gym in Cannock, showing LED panel lighting across the suspended ceiling beneath a mezzanine level, with resistance machines, free weights and a painted mural on the far wall.
Completed lighting installation across the main gym floor
Overview

RS Electrical was appointed by Saxon Gym to deliver the design, specification and complete electrical installation for its new facility in Cannock, converting an existing industrial unit into a purpose-built training environment.

Saxon Gym is a bodybuilding gym with a national reputation in the sport and a clear attention to detail in how the facility is presented. The electrical installation needed to do more than meet the practical requirements of the building: it had to work with the gym's interior and contribute to the finished environment rather than sit apart from it.

The wider project involved an extensive refurbishment of the unit, with significant building works undertaken alongside the electrical installation. RS Electrical was responsible for the electrical scope from initial design and specification through to installation, inspection, testing and certification, working to a six-week programme.

Scope of works
  • Electrical design and specification for the converted unit
  • New distribution boards and electrical distribution throughout
  • Complete new lighting installation across the gym floor and ancillary areas
  • Accent lighting to the mirrored walls and studio areas
  • Small power throughout the building
  • Dado trunking systems serving cardio equipment including treadmills and stairmasters
  • Adaptation and re-feeding of existing supplies serving air conditioning equipment
  • Inspection, testing and certification on completion
The challenge
Raised cardio deck at Saxon Gym in Cannock, with a row of treadmills and cross-trainers served by dado trunking along the platform edge.
Dado trunking serving the cardio deck

An installation that had to work as part of the interior

A gym conversion of this kind places the electrical installation directly in view. There are few concealed service routes on an open training floor, the equipment layout dictates where power has to land, and the lighting is a visible part of how the finished space reads.

The client's standards for the finished environment were high, and the completion date was fixed. That combination meant the positioning and specification of lighting, trunking and outlets had to be resolved as part of the design rather than worked out on site, so that the installation landed cleanly against the interior finishes first time.

Delivery

Design, installation and lighting

New distribution boards and distribution were installed to serve the converted unit, with small power provided throughout the building and dado trunking systems run to serve the cardio equipment, including treadmills and stairmasters. Existing supplies serving the air conditioning equipment were adapted and re-fed as part of the refurbishment.

Lighting played a significant part in the finished result. Alongside the main lighting installation across the gym floor and ancillary areas, RS Electrical incorporated accent lighting to the large mirrored walls, picking out the mirrors against Saxon Gym's black, grey and orange interior.

The positioning and specification of the lighting was considered as part of the electrical design, so that the finished installation provided the illumination levels the space needed while fitting with the building's structure, the equipment layout and the interior design.

Our electricians worked alongside the other trades involved in the refurbishment, keeping the electrical installation progressing in step with the wider build. On completion, the installation was fully inspected, tested and certified by our team.

The result

Delivered in six weeks, with support continuing afterwards

The conversion was completed within the required six-week programme. The finished facility shows what is achievable when the electrical installation is treated as part of the overall design rather than purely as a building service.

RS Electrical's involvement did not end at handover. We continue to provide electrical maintenance and support to Saxon Gym, maintaining the installation and supporting the facility as its requirements develop.

Mirrored studio room at Saxon Gym in Cannock, with a continuous linear accent light above the full-height mirrors and recessed LED panels in the black suspended ceiling.
Accent lighting above the studio mirrors
Free weights area at Saxon Gym in Cannock, with dumbbell racks along a mirrored wall lit by a continuous linear accent light, beneath rooflights and an exposed steel roof structure.
Accent lighting to the mirrored wall
Resistance machine area at Saxon Gym in Cannock, lit by recessed LED panels set into a black suspended ceiling grid.
LED panel lighting to the machine area
Mezzanine level at Saxon Gym in Cannock, with glazed windows overlooking the gym floor, LED panel lighting to the underside of the mezzanine and a large painted mural on the adjacent wall.
Lighting to the mezzanine and gym floor
Talk to the team

Planning a fit-out or unit conversion?

From initial design and specification through to installation, testing and certification, RS Electrical delivers complete electrical installations for commercial fit-outs and conversions.